In 2024 the EU adopted a reform of the electricity market, and it is often mentioned when the future of batteries and flexibility is discussed. For an indust...

In 2024 the EU adopted a reform of the electricity market, and it is often mentioned when the future of batteries and flexibility is discussed. For an industrial decision-maker the question is concrete: What does the reform actually change, and does it matter for a battery today? The answer is that the reform strengthens the framework for flexibility and storage at EU level, but that the mechanisms with direct significance in Denmark are still under development.

This article walks through what the reform consists of, which elements are relevant for storage, what capacity markets are, and where Denmark stands. We go a step deeper than the shorter overview in the BESS101 series and aim to be precise about what has been decided and what has not. That distinction matters, because the reform is easily presented as a finished change to everyday life for battery owners, while the reality is that much of it still has to be turned into concrete national schemes.

What the reform is

The reform consists of two legal acts, both adopted in June 2024. One is Regulation (EU) 2024/1747, which amends the existing regulations on the electricity market and on the energy regulatory agency ACER. The other is Directive (EU) 2024/1711, which amends the electricity market directive and the renewable energy directive. A regulation applies directly, while a directive must be transposed into national law within a deadline.

According to the European Commission, the purpose of the reform is to make electricity prices more stable, protect consumers better against short price swings, accelerate the build-out of renewable energy, and strengthen the role of flexibility and storage. The rules entered into force on 16 July 2024, and parts of the directive are to be transposed into national law during 2025.

What the reform means for flexibility and storage

A recurring feature of the reform is that flexibility and storage take a more central place. The reform recognises flexible consumption and energy storage as part of the solution for an electricity system with a large share of wind and solar.

Concretely, the reform introduces three elements worth knowing. First, each member state must continuously assess its need for flexibility in the electricity system, so that the need is mapped rather than assumed. Second, member states must set an indicative target for how much non-fossil flexibility, including storage and flexible consumption, is required. Third, member states gain the option to introduce actual support schemes for non-fossil flexibility. Taken together, the three elements mean that storage is no longer merely tolerated in the market, but something that states must actively plan for and can support.

For a battery owner, the important point here is not a single new revenue stream, but a direction. The reform makes clear that flexibility is to play a larger role, and it gives member states tools to support that. How those tools are used in practice depends on national implementation, which we return to below.

Capacity markets: what they are

One of the concepts the reform brings into focus is capacity mechanisms, often referred to as capacity markets. A capacity mechanism is a payment for having capacity available: that is, for a facility being able to deliver power when the system needs it, as a supplement to what the facility earns on the energy market itself. The purpose is to ensure that there is sufficient capacity to cover demand, including in periods with low production from solar and wind.

The European Commission describes capacity mechanisms as something member states can introduce if an analysis shows a need for them, and under specific conditions. The reform clarifies the framework for such mechanisms, including that they can be designed so that storage and flexible consumption can participate, not only traditional generation. That is an important nuance: if a capacity mechanism is introduced, batteries can in principle be part of it.

Where Denmark stands

Here it is important to be precise, because there is a difference between what the EU makes possible and what applies in Denmark today. Denmark does not currently have a general capacity mechanism. The Danish Energy Agency (Energistyrelsen) has started work to examine whether a capacity mechanism is relevant, and has had a legal basis out for consultation, but no political decision has yet been taken to introduce a concrete mechanism. Such a mechanism would also require documentation of the need, state-aid approval, and an amendment to the Electricity Supply Act (elforsyningsloven).

In other words: the framework at EU level is in place, but Danish use of capacity mechanisms is still under clarification. We think it is more honest to say that clearly than to imply that a Danish capacity market for batteries is already a reality. In parallel, the Danish Energy Agency is working on analyses of how flexibility can contribute to a more cost-effective build-out of the electricity grid, including flexible grid connection terms and a possible flexibility market. Here too, the material consists of recommendations and analyses, not finished, decided schemes.

Long-term contracts and price hedging

The reform also strengthens the long-term agreements that can make prices more predictable. It promotes the use of power purchase agreements, abbreviated PPA, which are long-term electricity purchase agreements between a producer and an offtaker at an agreed price over a longer period. Through a PPA, a company can secure a more stable electricity price instead of being fully exposed to swings in the spot market.

In addition, the reform frames two-way contracts for difference, often called CfDs, for publicly supported new generation. The principle of a two-way contract for difference is that if the market price falls below an agreed level, the producer receives the difference, and if the price rises above the level, the producer pays the difference back. That dampens swings in both directions. For an industrial company, the point is not that it necessarily has to enter into such contracts itself, but that the reform tries to move part of electricity trading away from short-term price swings and toward more stable, long-term agreements. That is not in itself a battery mechanism, but it is part of the overall direction toward a more robust market.

What it changes for batteries

Overall, the reform moves batteries and flexibility closer to the centre of the electricity market. Recognition of storage, the obligation to assess flexibility needs, and the option to let storage participate in capacity mechanisms all point in the same direction. But for a concrete facility in Denmark today, the direct effects still depend on national implementation.

Participation in any market also presupposes that the facility meets the technical and market requirements we have described in earlier articles on system services and prequalification. The reform does not change the fact that a battery must be prequalified and meet the requirements in order to deliver.

In practical terms, the most useful approach is to distinguish between two time horizons. In the short term, it is the existing markets (system services, spot and intraday) that carry the value of a battery, unchanged by the reform. Over a longer horizon, the reform's new frameworks, including a possible Danish capacity mechanism and support schemes for flexibility, may add new opportunities. A decision about battery hosting today should rest on what applies now, not on schemes that are still under clarification. The reform is a reason to follow developments closely, not a reason to assume specific future revenues.

Where ZynexGroup stands

ZynexGroup follows changes to market frameworks and assesses through a partner which markets the battery can technically and contractually enter. ZynexGroup finances, builds, owns and operates the battery. The host provides a little outdoor space and site rights and receives a monthly share of operating profit. That share depends on the market and operating results and is never guaranteed. Site-specific economics are confirmed in the assessment and proposal. Use the free battery calculator to assess space requirements. Battery export requires the grid company’s permission, and approval is not guaranteed.

ZynexGroup's approach to facility assessment

We always assess the concrete facility and site first. Grid connection, consumption profile and operational needs determine what a battery can realistically be used for, and which market frameworks are relevant. On that basis we have a data-based conversation about how the reform's possibilities may matter for that particular company, without assuming schemes that have not yet been decided.

Overall perspective

The 2024 electricity market reform consists of a regulation and a directive that strengthen flexibility and storage, promote long-term contracts, and frame capacity mechanisms that storage can participate in. At EU level, the direction is clear. In Denmark, the application, including a possible capacity mechanism, is still under clarification.

For industrial companies, the useful point is that the reform makes flexibility more valuable over time, but that a battery's concrete opportunities today still depend on the national frameworks and on the facility meeting the applicable requirements. The right approach is therefore to base decisions on the markets that exist now, and at the same time keep an eye on the new frameworks as they become concrete Danish schemes. We follow the development and arrange participation according to what is actually possible.

Get an assessment of your facility's potential

If you want to know how the new market frameworks can interact with an industrial BESS system on your site, we start from your own data: grid connection, consumption profile and history. On that basis we make an initial assessment of whether there is a match, and what the next step could then be. You are welcome to contact us.