ZynexGroup owns and operates the battery. Understand the host’s site rights, share of operating profit and site-specific backup assessment.
Who owns the battery when a business hosts a ZynexGroup BESS? ZynexGroup finances, builds, owns and operates the battery. The host provides a little outdoor space and site rights.
The host receives a monthly share of operating profit. The share depends on market and operating results and is never guaranteed. Ownership, operation and the host's contribution are distinct roles in the cooperation.
ZynexGroup owns and operates the system
The battery belongs to ZynexGroup. ZynexGroup handles financing, construction and operation. The host provides space and site rights so the system can be installed and operated under the agreed terms.
The agreement needs to describe location, access and the rights required for operation. Changes to the property or the business's electricity consumption should be discussed so their effects on the system can be assessed.
What can the battery be used for?
A battery can charge and discharge at different times, providing flexibility for electricity markets. ZynexGroup operates the system, and Hybrid Greentech is the planned BRP and market optimisation partner.
The host's own requirements need to be clarified as part of the project. Having the battery at the property does not itself give the host the right to change its controls or appoint another operator. Specific usage rights must be set out in the agreement.
Peak shaving and backup need assessment
Peak shaving means discharging the battery to limit the business's grid power draw during periods of high consumption. Whether it can be included needs assessment alongside other operations and local conditions.
Backup is a separate technical question. A grid-connected battery cannot automatically keep the business's installation running during an outage. Backup needs a site-specific design. Reserving capacity for the host's own needs must be considered in both technical and financial assessments.
What needs clarification before an agreement?
- Battery location and access. Use the free battery calculator to explore space requirements.
- The site rights the host provides.
- How operating profit and the host's monthly share are calculated.
- Any requirements for backup or other on-site uses.
- How changes, a property sale and the end of the agreement are handled.
Battery export requires the grid company's permission. Approval is not guaranteed, and additional export capacity may be refused. Ownership and a possible location alone do not establish that a project can proceed.
Clarify the roles at your site